Download Beyond Manufacturing Resource Planning (MRP II): Advanced by Jan Olhager, Joakim Wikner (auth.), Prof. Dr. Andreas Drexl, PDF

By Jan Olhager, Joakim Wikner (auth.), Prof. Dr. Andreas Drexl, Dr. Alf Kimms (eds.)

ISBN-10: 3642083935

ISBN-13: 9783642083938

ISBN-10: 3662037424

ISBN-13: 9783662037423

The good judgment of producing source making plans (MRP II) is im­ plemented in so much advertisement construction making plans software program instruments and is usually permitted through practitioners. despite the fact that, those peo­ ple are usually not happy with construction making plans and whinge approximately lengthy lead occasions, excessive work-in-process, and backlogging. As many researchers have mentioned, the cause of those shortcomings is inherent to the equipment which are used. The learn group is hence wanting to locate extra subtle ways. This publication is an try and bring together a few cutting-edge paintings within the box of creation making plans study. It comprises mate­ rial that by some means dominates the prevailing MRP II inspiration. 15 ar­ ticles written via 36 authors from 10 international locations hide many elements regarding MRP II. All papers went via a single-blind refere­ eing strategy earlier than they have been chosen for being released during this e-book. once we acquired papers for this factor, we stumbled on that MRP II is a subject approximately which not just administration scientists exhibit curiosity. because the record of authors proves, commercial engineers, desktop scientists, and-operations researchers from academia in addition to practitioners have contributed to this booklet. This, we are hoping, makes the ebook of worth for a vast viewers. We thank all authors who submitted papers. And, we're in­ debted to Dr. Werner Muller from Springer for his aid during this e-book project.

Show description

Read Online or Download Beyond Manufacturing Resource Planning (MRP II): Advanced Models and Methods for Production Planning PDF

Similar manufacturing books

Implementing and Configuring SAP MII

Enforce and configure SAP MII to suit your assorted production initiatives and matters with this must-have, entire advisor to SAP MII. find out how to create composite functions that attach your small business approaches together with your plant platforms. when you know the way to hyperlink your plant structures to generate accomplished and actual facts, use SAP MII instruments to generate actual reviews and dashboards for research and real-time tracking, resulting in a extra effective and powerful store flooring.

Atlas of Fibre Fracture and Damage to Textiles, Second Edition

According to over 25 years of study on the collage of Manchester Institute of technological know-how & know-how, Atlas of Fibre Fracture and harm to Textiles includes greater than 1,500 scanning electron micrographs and different photos, providing a special selection of documentary info. The explanatory textual content offers fibre and polymer scientists an evidence of fracture mechanisms and descriptions strategy to maximize fabric existence span, allowing fabric technologists and layout engineers to fabricate better cloth items, and supporting forensic scientists to spot reason behind failure.

Automatic Supervision in Manufacturing

Automation is a essential target within the improvement of recent and complicated production construction. automated Supervision inManufacturing (ASM) addresses unavoidable disturbances happening in the course of creation. Its software leads to the unmanned functioning of producing structures via finished and trustworthy supervision.

Extra resources for Beyond Manufacturing Resource Planning (MRP II): Advanced Models and Methods for Production Planning

Sample text

The degree to which a fact is believed IS indicated by its certainty factor, an integer between -100 and 100. Each performance measure, except critical tardy jobs, has an acceptable range for the user to select the lowest (a) or the highest (b) value. If the system cannot find any MPS with such requirements, but it finds an MPS with a performance measure value 39 in the acceptable range, then the certainty factor for that results will be 95 instead of 100. The other possibility is that the system finds an MPS with a performance measure value outside the acceptable range (but inside the permissible range).

6. Selection Criterion: Maximum (MAX), Minimum (MIN). The rules suggested in this section are combined in all possible ways thus generating 48 possible combinations of which 24 are classified as the product priority and the remaining 24 as the cell priority. Siier et al. [15] described these rules extensively. MAX INFP /MIN means that ·this application is a product priority case where first a product is selected based on the EDD rule. If there are several products with the same due date, then the product with maximum number of feasible cells is given the highest priority.

2 Input Data for Knowledge-Based System The data required for the knowledge-based system are: (1) The MPS set to be evaluated, (2) the rule combination associated with each 34 MPS in the set, and (3) the values of each of the five performance measures for each MPS. All of this data is contained in the database file created by the Cell Loading Program. 3 Methodology for Master Schedule Evaluation The typical flow in the evaluation of master schedules is presented in Figure 5. The first step that the knowledge-based system performs is to load the entire database file created by the cell loading program.

Download PDF sample

Beyond Manufacturing Resource Planning (MRP II): Advanced Models and Methods for Production Planning by Jan Olhager, Joakim Wikner (auth.), Prof. Dr. Andreas Drexl, Dr. Alf Kimms (eds.)


by Daniel
4.2

Rated 4.70 of 5 – based on 48 votes